FleaPlus writes "NASA and the White House have officially released their FY2013 budget proposal, the first step of the Congressional budget process. As mentioned previously on Slashdot, the proposal decreases Mars science funding (including robotic Mars missions) down to $361M, arguably due in part to cost overruns by the Webb telescope. The proposal also lowers funding for the in-house SLS rocket and Orion capsule to $2.8B, while doubling funding for the ongoing competitive development of commercial crew rockets/vehicles to $830M. The ranking member of the Senate science committee, Sen. Hutchison (R-TX), expressed her frustration with 'cutting SLS and Orion to pay for commercial crew,' as it would allegedly make it impossible for SLS to act as a backup for the commercial vehicles."
Re:Why Should NASA Develop a Commercial Rocket (Score:4, Interesting)
But I have not heard any sound justification for public funding of commercial development.
NASA has a space station, ISS, run jointly with international partners. With the end of the shuttle program, NASA has no ability to launch crew or equipment to the ISS, and must purchase flights on a foreign launcher. The cost of seats has increased sharply since NASA became dependent, and the reliability of the foreign launch vehicle has decreased sharply. Each time the foreign launcher is grounded for safety reasons, there's a risk that the ISS will have to be abandoned because there is no alternative vehicle, and their capsule cannot land in winter. And NASA has no control over them, or any way to enforce standards.
So NASA is spending less than a billion dollars on subsidising (but not fully funding) four US commercial crew launchers, and two cargo launchers. That enables them to bring forward the first commercial crew flights, and gives them a powerful guarantee that the commercial systems will meet NASA's requirements. Judging by SpaceX prices, this will, in the long term, at least halve the cost of launching US astronauts to the ISS compared to the foreign launcher.
Once developed, some of the commercial players may also carry tourist flights and non-NASA funded science flights. This creates a secondary market that, from NASA point of view, subsidises the continued development of launch capacity to NASA's benefit.
Importantly, if any of the four commercial players do not meet NASA's goals, they will not be paid.
By contrast, NASA is spending $3 billion per year on commercial contractors to build NASA's own SLS launcher and MPCV capsule. This will likely launch no more than twice per year at about $1.5 billion per launch, and carry no more than 4 astronauts per year. It is estimated to cost about $70 billion to develop, and launch crew no earlier than 2021, assuming it doesn't go over-schedule or over-budget. (Prior to its cancellation, the schedule of the previous program, Constellation, was slipping 1 year per year.)
All risks of this project are NASA's, all cost overruns come out of NASA's budget.
So the issue is which of these two approaches is the most cost effective way for NASA to fulfil it's goals on the limited budget it is given.
Advocates of Commercial Crew believe that being able to develop four new commercial carriers on a budget of $200 million per year each, is much more cost effective than developing one launcher on a budget of $3,000 million per year. Thus cancelling SLS and directing it's $3 billion per year budget to CCDev style goal-driven development will allow NASA to leverage a much greater capacity for BEO missions.
Hope that helps.
Re:Backup? (Score:5, Interesting)
You're kidding yourself if you believe that the SLS is truly about fielding a rocket. There are very few people intimately familiar with the space industry (outside those with a vested interest in saying so) who believe it will ever fly. Massive NASA projects like this get canceled before completion, the history of the last 35 years has been almost completely consistent about this. The ISS is the sole exception and that squeaked past by the only the thinnest of margins despite bringing in international partners and using it as a means to keep certain kinds of technical talent in Russia legitimately gainfully employed in the decade following the fall of the USSR. The supporters of SLS know quite well it won't run to completion, but they don't support it for what it could do for US space capabilities, they do it because for however long they string it along, it means jobs in their districts, influx of capital to their districts, and it provides a way to funnel funds to particular contractors. Once it gets canceled, they just rig up a new project targeted to sound impressive to the sheeple in the general public who don't know enough about space to realize this but who are generally willing to support NASA.
Moreover the whole idea that heavy lift of some arbitrarily high size is 'required to do human exploration beyond LEO' is just the fig leaf they use as an excuse, banking on the fact that the general public will never doublecheck and find out that it is completely false. Heavy lift is not at all required. Don't believe me, have a listen to this NASA conference call on the subject:
Logistics and Operations versus Heavy Lift: Examining Approaches to Human Exploration in a Cost-Constrained Era
http://spirit.as.utexas.edu/~fiso/telecon/Akin_12-14-11/ [utexas.edu]
If we need heavier lift than is available right now, we'll have the Falcon Heavy from SpaceX available in 2-3 years and I'd be willing to bet that the ULA could field the heavier versions of the Delta IV and Atlas V that they have on the drawing boards 3ish years after NASA commits to needing them. Neither of these options costs NASA tens of billions of dollars or a decade of work...which is precisely why congress doesn't like them.
NASA could be doing a lot of cool stuff in space both cheaper and sooner, but from a congressional standpoint that is not what NASA dollars are for.